TOEIC Link Vocabulary: Office Relocation and Move Management Cluster
Office relocation is one of the most reliable TOEIC business scenarios, because it mixes logistics, scheduling, and internal communication in a single situation. A facilities manager announces a move date, a vendor submits a quote for packing and transport, or an all-staff email explains where to find the new floor plan. This cluster gathers the terms that recur across Listening Part 3 and 4 conversations and Reading Part 6 and 7 documents about company moves, so you can read them as one working business vocabulary instead of isolated flashcards — exactly what the TOEIC Link approach is built for.
Core relocation terms
- relocation / move — the act of changing business premises. The relocation to the new headquarters begins next quarter.
- premises — the building and grounds a company occupies. The lease on the current premises expires in March.
- floor plan / layout — a diagram showing how offices and desks are arranged. The updated floor plan puts the sales team near the entrance.
- workstation / cubicle — an individual work area. Each workstation will be numbered before the move.
- downtime — a period when work stops during the transition. Scheduling the move over a weekend minimizes downtime.
Vendor and logistics vocabulary
TOEIC documents about moves lean heavily on the language of hired services and scheduling:
- moving company / mover / vendor — the contractor hired to carry out the move. Three movers submitted bids for the relocation.
- quote / estimate — a proposed price for the work. The lowest estimate still excluded insurance.
- packing / crating — preparing items for transport. Packing materials will be delivered the day before.
- inventory — a list of items being moved. Every department must submit an equipment inventory by Friday.
- transport / haul — moving the items to the new site. The transport of the servers requires a climate-controlled truck.
Relocation scenarios share almost identical logistics language with other facilities and services situations. If your prep also touches recurring building services, review the pest control services and contract cluster — the vendor, quote, and scheduling vocabulary transfers directly.
Scheduling and communication vocabulary
Because a move affects everyone, a second set of terms appears in the internal notices TOEIC loves to test:
- timeline / schedule — the planned sequence of move activities. The timeline lists packing, transport, and setup over three days.
- notice / announcement — the message informing staff of the change. An announcement with the new address went out to all employees.
- access / key card — the means of entering the new building. New key cards must be collected from reception.
- setup / installation — arranging equipment at the destination. IT will handle the network setup on the first morning.
- settling-in period — the time staff need to adjust after the move. A short settling-in period is expected before full productivity returns.
How TOEIC frames the scenario
Expect these terms in familiar formats: a Part 3 conversation where a manager and a vendor confirm the move date and estimate; a Part 4 announcement telling staff where to collect key cards and find the new floor plan; a Part 6 email inserting the right word into a relocation notice; or a Part 7 double passage pairing a moving-company quote with a facilities timeline. The questions rarely test the furniture — they test whether you can follow who does what, by when, and at which location.
Because a single relocation document often mixes vendor estimate language with internal schedule and access vocabulary, reading the whole cluster as one business situation is far more effective than memorizing single words. For the internal-message vocabulary that surrounds these notices, see the business email vocabulary cluster.
Quick recap
- Relocation: relocation, premises, floor plan, workstation, downtime.
- Logistics: moving company, quote, packing, inventory, transport.
- Communication: timeline, notice, access, setup, settling-in period.
Master the cluster as a connected business scenario, and the Listening conversations and Reading documents about office moves become predictable. Continue with the commonly confused word pairs master index to sharpen the single-word choices that Part 5 tests inside these same contexts.